Even though we have a double wythe brick wall on three sides and an 8" concrete masonry back wall, we are still furring out the inside wall so we can insulate the exterior wall.  This will give us a great R value and make it cheaper to heat and cool the space.  We'd like to make this building as cheap as possible run.
The bathroom is existing but we've removed the gypsum board and left the framing.  The fixtures will be reused since they are in good condition.  We're still hoping the windows are put in today!